Realization of the new highway station of Trento south and the junction for Ravina - Oberosler Un percorso verso l'alto

Realization of the new highway station of Trento south and the junction for Ravina

New highway station of Trento south consisting of nr.8 tracks of input and output, two arched bridges over the Adige river and the Brenner Highway 167 mt long and 36 mt long and a viaduct over the Brenner Highway 327 mt. long.

Autostrada del Brennero S.p.A.

2010 2014

€14.300.000

Back
Forward
list
PDF download

Realization of the new highway station of Trento south and the junction for Ravina

New highway station of Trento south consisting of nr.8 tracks of input and output, two arched bridges over the Adige river and the Brenner Highway 167 mt long and 36 mt long and a viaduct over the Brenner Highway 327 mt. long.

Autostrada del Brennero S.p.A.

2010 2014

€14.300.000