Construction of the by-pass of Merano (BZ) - 1° Lot - Oberosler Un percorso verso l'alto

Construction of the by-pass of Merano (BZ) - 1° Lot

Construction of an artificial tunnel length of 1000 meters with exit at two levels.

Autonomous Province of Bolzano

2011 2013

€41.630.000

Back
Forward
list
PDF download

Construction of the by-pass of Merano (BZ) - 1° Lot

Construction of an artificial tunnel length of 1000 meters with exit at two levels.

Autonomous Province of Bolzano

2011 2013

€41.630.000