Works for restoration and modification of the Mont Blanc Tunnel - Oberosler Un percorso verso l'alto

Works for restoration and modification of the Mont Blanc Tunnel

Supply and installation of the lining of the piers in the work for the restoration and adaptation of the Mont Blanc tunnel, following the fire on 24 March 1999. Tunnel length km. 11 + 600.

SITMB Società per il Traforo Monte Bianco

2001 2002

€15.900.000

Back
Forward
list
PDF download

Works for restoration and modification of the Mont Blanc Tunnel

Supply and installation of the lining of the piers in the work for the restoration and adaptation of the Mont Blanc tunnel, following the fire on 24 March 1999. Tunnel length km. 11 + 600.

SITMB Società per il Traforo Monte Bianco

2001 2002

€15.900.000