Tunnel by-pass “Bronzolo-Bolzano” on the S.S.12 highway - Oberosler Un percorso verso l'alto

Tunnel by-pass “Bronzolo-Bolzano” on the S.S.12 highway

Construction on the S.S. 12 of the Laives bypass 3,650 mt long, consisting of one tunnel 2,880 mt long and 2 viaducts of 225 mt and 85 mt.

Autonomous Province of Bolzano

2009 2011

€39.000.000

Back
Forward
list
PDF download

Tunnel by-pass “Bronzolo-Bolzano” on the S.S.12 highway

Construction on the S.S. 12 of the Laives bypass 3,650 mt long, consisting of one tunnel 2,880 mt long and 2 viaducts of 225 mt and 85 mt.

Autonomous Province of Bolzano

2009 2011

€39.000.000