Incinerator of Bolzano - Oberosler Un percorso verso l'alto

Incinerator of Bolzano

Construction of the new incinerator of Bolzano to generate heat by waste recycling with a capacity of waste disposal of 130,400 tons / year and an annual production of 89,080 MWh of electricity and 240,000 MWh of thermal energy.

Autonomous Province of Bolzano

2009 2014

€106.000.000

Back
Forward
list
PDF download

Incinerator of Bolzano

Construction of the new incinerator of Bolzano to generate heat by waste recycling with a capacity of waste disposal of 130,400 tons / year and an annual production of 89,080 MWh of electricity and 240,000 MWh of thermal energy.

Autonomous Province of Bolzano

2009 2014

€106.000.000