Construction of the new incinerator of Bolzano to generate heat by waste recycling with a capacity of waste disposal of 130,400 tons / year and an annual production of 89,080 MWh of electricity and 240,000 MWh of thermal energy.
Autonomous Province of Bolzano
2009 2014
€106.000.000
Construction of the new incinerator of Bolzano to generate heat by waste recycling with a capacity of waste disposal of 130,400 tons / year and an annual production of 89,080 MWh of electricity and 240,000 MWh of thermal energy.
Autonomous Province of Bolzano
2009 2014
€106.000.000