Improvement works to the S.S. 49 Pusteria valley road from km 27+300 to 29+000 - Oberosler Un percorso verso l'alto

Improvement works to the S.S. 49 Pusteria valley road from km 27+300 to 29+000

Construction of a road tunnel 620 metres long, executed with a roadheader, and bridge over Rienza river of 36 metres

Autonomous Province of Bolzano

2009 2010

€18.500.000