Construction of the Barnica highway tunnel 300 m long and the Tabor highway tunnel 580 m long with southbound and northbound galleries through friable rock with concrete cladding.
DARS
2007 2008
€25.500.000
Construction of the Barnica highway tunnel 300 m long and the Tabor highway tunnel 580 m long with southbound and northbound galleries through friable rock with concrete cladding.
DARS
2007 2008
€25.500.000