Realization of the water supply tunnel of Terres - Oberosler Un percorso verso l'alto

Realization of the water supply tunnel of Terres

Realization of a water supply conduit between Val di Tovel and Val di Non. The work consists principally of mechanized digging of a 1400-meter long tunnel with TBM  technologies and 3.50 m boring diameter.

Municipality of Terres

2001 2004

€6.100.000

Back
Forward
list
PDF download

Realization of the water supply tunnel of Terres

Realization of a water supply conduit between Val di Tovel and Val di Non. The work consists principally of mechanized digging of a 1400-meter long tunnel with TBM  technologies and 3.50 m boring diameter.

Municipality of Terres

2001 2004

€6.100.000