Realization of a water supply conduit between Val di Tovel and Val di Non. The work consists principally of mechanized digging of a 1400-meter long tunnel with TBM technologies and 3.50 m boring diameter.
Municipality of Terres
2001 2004
€6.100.000
Realization of a water supply conduit between Val di Tovel and Val di Non. The work consists principally of mechanized digging of a 1400-meter long tunnel with TBM technologies and 3.50 m boring diameter.
Municipality of Terres
2001 2004
€6.100.000