Works to conform to type 1/b of the CNR/80 norms with the construction of the third lane of the GRA (ring road) and the new exit Casal del Marmo.
ANAS S.p.A.
2003 2005
€36.650.000
Works to conform to type 1/b of the CNR/80 norms with the construction of the third lane of the GRA (ring road) and the new exit Casal del Marmo.
ANAS S.p.A.
2003 2005
€36.650.000