Hydrodemolition of the damaged concrete of the Gardena Viaduct (L=245 meters) and Colma Viaduct (L=595 meters), supporting structure rectified with cement render, and construction of two noise barrier on the north and southbound traffic lanes.
Autostrada del Brennero S.p.A
2008 2009
€13.000.000
Hydrodemolition of the damaged concrete of the Gardena Viaduct (L=245 meters) and Colma Viaduct (L=595 meters), supporting structure rectified with cement render, and construction of two noise barrier on the north and southbound traffic lanes.
Autostrada del Brennero S.p.A
2008 2009
€13.000.000