Works for the regrading and refinishing of the S.P.55 for Acereto - Oberosler Un percorso verso l'alto

Works for the regrading and refinishing of the S.P.55 for Acereto

Regrading and refinishing of a section of the S.P. 155 including retaining walls of exceptional height faced with natural stone and a bridge with a span of 10 meters.

Autonomous Province of Bolzano

2003 2005

€5.000.000

Back
Forward
list
PDF download

Works for the regrading and refinishing of the S.P.55 for Acereto

Regrading and refinishing of a section of the S.P. 155 including retaining walls of exceptional height faced with natural stone and a bridge with a span of 10 meters.

Autonomous Province of Bolzano

2003 2005

€5.000.000