Works for the construction of the rainwater and sewage system of Predazzo - Oberosler Un percorso verso l'alto

Works for the construction of the rainwater and sewage system of Predazzo

Construction of the rainwater and sewage system in the inhabited center of Predazzo with round cast iron and reinforced concrete pipes for an overall length of 7,100 meters.

Municipality of Predazzo

1999 2003

€3.510.000

Back
Forward
list
PDF download

Works for the construction of the rainwater and sewage system of Predazzo

Construction of the rainwater and sewage system in the inhabited center of Predazzo with round cast iron and reinforced concrete pipes for an overall length of 7,100 meters.

Municipality of Predazzo

1999 2003

€3.510.000