North and south galleries of the Fortezza Tunnel - Oberosler Un percorso verso l'alto

North and south galleries of the Fortezza Tunnel

Hydrodemolition of the damaged concrete, reconstruction with cement render and renewal of the lighting installation. Southbound gallery (L=960 meters). Northbound gallery (L=745 meters).

Autostrada del Brennero S.p.A.

2000 2001

€10.400.000

Back
Forward
list
PDF download

North and south galleries of the Fortezza Tunnel

Hydrodemolition of the damaged concrete, reconstruction with cement render and renewal of the lighting installation. Southbound gallery (L=960 meters). Northbound gallery (L=745 meters).

Autostrada del Brennero S.p.A.

2000 2001

€10.400.000