Bypass of Ora - 1° lot. - Oberosler Un percorso verso l'alto

Bypass of Ora - 1° lot.

Realization of the bypass of Ora including two natural rock tunnels 120 and 980 meters long and two artificial tunnels in concrete 125 and 66 meters long.

Autonomous Province of Bolzano

2007 2008

€18.000.000

Back
Forward
list
PDF download

Bypass of Ora - 1° lot.

Realization of the bypass of Ora including two natural rock tunnels 120 and 980 meters long and two artificial tunnels in concrete 125 and 66 meters long.

Autonomous Province of Bolzano

2007 2008

€18.000.000