Construction of the bypass of Foresta e Tel and underpass of S.P. of Parcines from Km 192,00 to 196,80. - Oberosler Un percorso verso l'alto

Construction of the bypass of Foresta e Tel and underpass of S.P. of Parcines from Km 192,00 to 196,80.

Construction of two natural tunnels 160 m and 520 m long, clad in concrete, and two artificial tunnels 90 m and 50 m long.

Autonomous Province of Bolzano

2006 2007

€9.300.000

Back
Forward
list
PDF download

Construction of the bypass of Foresta e Tel and underpass of S.P. of Parcines from Km 192,00 to 196,80.

Construction of two natural tunnels 160 m and 520 m long, clad in concrete, and two artificial tunnels 90 m and 50 m long.

Autonomous Province of Bolzano

2006 2007

€9.300.000